Guide
Interior design KPIs: the 10 numbers every studio should track
Most studios know whether they're busy. Far fewer know whether they're profitable, where their best clients come from or how long they wait to be paid. Ten numbers, checked monthly, answer all three.
The short answer
Track four sales numbers (enquiries, conversion to proposal, win rate and average project value), three money numbers (project margin, invoices outstanding and days to get paid) and three operations numbers (time to first reply, billable utilisation and on-time installs). Look at them monthly, compare each with the same period before, and act on the one that has moved most.
Why a small studio needs KPIs
A design business can feel successful while losing money: a full diary of projects with thin margins, or a good year of fees with a growing pile of unpaid invoices. A handful of numbers, measured the same way every month, shows problems months before they reach the bank account. Keep the list short. Ten numbers you actually look at beat forty you don't.
Sales: is enough good work coming in?
| KPI | How to measure it | What it tells you |
|---|---|---|
| 1. Enquiries by source | New enquiries per month, split by where they came from | Which marketing actually works |
| 2. Enquiry to proposal | Proposals sent ÷ enquiries received | How well you qualify leads |
| 3. Win rate | Proposals accepted ÷ proposals decided | Whether your pricing and proposals land |
| 4. Average project value | Total value of won projects ÷ number won | Whether you're attracting the right size of job |
Count win rate only on proposals that have been decided, accepted or declined, so a pile of recent proposals doesn't drag it down. If one source brings many enquiries but a low win rate, it may be costing you more time than it's worth.
Money: is the work profitable and paid?
| KPI | How to measure it | Healthy sign |
|---|---|---|
| 5. Project margin | (Fees + product margin − product costs − time cost) ÷ revenue, per project | Stable or rising across similar projects |
| 6. Invoices outstanding | Total unpaid, and how much is overdue | Overdue a small share of the total |
| 7. Days to get paid | Average days from invoice to payment | Close to your payment terms |
Project margin is the number most studios never calculate. Include your time at a realistic cost per hour; see how to set your hourly rate. A project that looks good on fees can turn thin once revisions and site visits are counted. For product margin, see interior designer mark-up.
Operations: is the team working well?
| KPI | How to measure it | Why it matters |
|---|---|---|
| 8. Time to first reply | Hours from enquiry arriving to your first response | The first studio to reply often wins the job |
| 9. Billable utilisation | Billable hours ÷ total hours worked, per person | Shows admin creeping in |
| 10. On-time installs | Installs completed on the agreed date ÷ all installs | Reflects procurement and supplier control |
Reading the numbers
- Compare like with like. Look at each number against the previous month and the same month last year; studios are often seasonal.
- Watch the trend, not the point. One slow month means little; three in a row is a pattern.
- Fix one thing at a time. If win rate falls, look at proposals before spending more on marketing. If days to get paid rises, tighten deposits and reminders first; see deposits and payment schedules.
A 30-minute monthly review
On the first working day of each month, look at the ten numbers for the month just ended. Write down the one that worries you most and one action for it: chase every overdue invoice over 30 days, rewrite the proposal template, or reply to every enquiry the same day for a month. Next month, check whether it moved.
Tracking KPIs in Riser
Riser builds these reports from the work you already do: enquiries, quotes, invoices, payments, time and jobs. The reports page groups them into Sales, Money, Team and Operations, with each figure compared to the previous period, and a report builder for anything else, including your own custom fields. You can reorder or hide the reports you don't need, save your own and export any report as CSV. Full reports are on the Pro and Studio plans. See also the interior design process.
Questions people ask
What is a good win rate for interior designers?
It varies with how well you qualify enquiries and how you price. Track your own rate on decided proposals over several months and work to improve it, rather than aiming for an industry figure.
How often should a design studio review its KPIs?
Monthly for the full set, with a quick weekly look at new enquiries and overdue invoices.
What is billable utilisation?
The share of time worked that you can charge to clients. If it falls, admin or unpaid revisions are taking over.
Do I need software to track KPIs?
You can start with a spreadsheet. A CRM that records enquiries, proposals, invoices and time calculates them automatically, so the numbers are always current.
Run your next project in Riser
The AI-powered CRM for interior designers: quotes clients sign, approvals, orders and payments in one place. Try every Pro feature free for 15 days, no card needed.